Proposed Construction of One storey building on Plot P36901 at Kijitonyama, Da es salaam

  • Category: Project
  • Published: Sunday, 22 June 2025 15:48
  • Written by Recafi
  • Hits: 44

  Client                                                 Designer                                                            Location                                             Size

 ANAEL WALTER                               RECAFI                                                   DAR ES SALAAM                                 1,000 SQM


 

Contractor                                Sub-Contractor                                                   Completion Date                      Delivery Method

    

 RECAFI                                       RECAFI                                                                    2026                                 Contracting

 

 

 

 

1. Project Title

Construction Project Report for Proposed Building at Kijitonyama, Dar es Salaam


2. Introduction

This report presents the activities and progress of the proposed construction project located at Kijitonyama, Dar es Salaam. The project involves the construction of a building designed to meet the required structural, functional, and safety standards. The report highlights the scope of work, methodology, and major construction activities undertaken during the implementation of the project.


3. Project Location

The project is situated in Kijitonyama, a rapidly developing urban area within Dar es Salaam. The location provides accessible infrastructure and supports residential and commercial developments.


4. Scope of Work

The project includes the following key construction activities:

  • Site preparation and clearing

  • Setting out of the building layout

  • Excavation and foundation works

  • Substructure construction

  • Superstructure construction

  • Electrical installation works

  • Plumbing and drainage installation

  • Finishing works (plastering, painting, flooring, etc.)


5. Methodology

The construction activities are carried out in a systematic manner following approved engineering and architectural drawings. Modern equipment and professional construction techniques are applied to ensure accuracy, safety, and efficiency throughout the project.

The setting out process is conducted using surveying equipment to establish the correct position of the building on the site. Substructure works involve excavation, foundation casting, and ground beams. After completion of the substructure, the superstructure works proceed with columns, beams, slabs, and walls. Electrical and plumbing systems are then installed according to building service requirements.


6. Equipment and Tools Used

The project utilizes several construction and surveying tools, including:

  • Total Station and GPS for setting out

  • Excavation tools and machinery

  • Concrete mixers

  • Levelling equipment

  • Hand construction tools


7. Health and Safety Measures

Safety measures are implemented on site to ensure the protection of workers and equipment. These measures include the use of personal protective equipment (PPE), proper site supervision, and adherence to construction safety standards.


8. Project Progress

The project is progressing according to the planned construction schedule. Key milestones such as setting out and initial foundation works have been successfully completed, and further construction activities continue as planned.


9. Challenges Encountered

Some challenges that may arise during the construction process include weather conditions, material supply delays, and site logistics. However, appropriate management strategies are implemented to minimize their impact on project progress.


10. Conclusion

The construction project at Kijitonyama is being executed following proper engineering practices and project management procedures. The coordinated efforts of the construction team ensure that the project progresses efficiently while maintaining quality and safety standards.

 

Recafi investment company limited set solid conditions in our daily activities through our programs such as (PCCS) - which means Plan, Commitment and Care of Safety at site , these are combined with several seminars and online meeting, in order for staff to identify key risks at all times.

Our Solutions

Contact Us

Sinza, Igesa RD - Dar es Salaam
House no.166 - P.O.Box 22036
+255 (0) 733 483 243
+255 (0) 719 325 511
This email address is being protected from spambots. You need JavaScript enabled to view it.